The back area was being finished and prepared for the asphalt to be laid next week. |
The forms for the sidewalk were put in place. |

Uncovering the sidewalk the next day. |

Landscaping was also completed this week. |



The floors were opened up and cleaned while work crews helped out so the gypcrete could be poured over the current floor. This allows the floor a more level foundation for the main flooring to be completed. |

| The construction crew working on leveling off the larger problem areas before the gypcrete was poured. |

More preparation for the gypcrete. |
Finally, the tracks for the walls are being placed. |


| The ceiling is being prepared for sandblasting. The ceiling will remain open to give that "gently used" feel. |